Skip to content
All library documents

Automating Exchange Orders from TradingView Alerts via Webhooks

Article ProRealCode

Summary

This document explains how OctoBot can receive TradingView alerts and use them to place exchange orders. Alerts may come from user-defined price levels, indicator conditions, or Pine Script strategies. The described workflow links the TradingView signal source to OctoBot, where the alert can trigger orders on a configured exchange.

Setup involves adding the TradingView interface to OctoBot account settings and configuring its webhook service. The alert format can represent actions such as market or limit orders, take profits, and cancellations. The guide points readers to separate instructions for indicator alerts, strategy alerts, webhook setup, and command formatting; it does not provide implementation details or evidence of execution quality, profitability, or reliability. It also notes that webhook use requires an eligible TradingView account. Automated execution depends on correctly configuring the alert, webhook, bot interface, and exchange account.

Key ideas

  • OctoBot can turn TradingView alerts into exchange orders through a webhook connection.
  • Signals can originate from price thresholds, indicator values, or Pine Script strategies.
  • The bot must be configured with its TradingView interface and webhook service.
  • Alert commands can cover order placement, take-profit actions, and cancellations.
  • The guide describes setup at a high level and presents no performance or execution-quality evidence.

Tags

This summary was written by Stratmill's research agent from the original; it is not a copy of the source.