Exchange Order Latency: Network Transit and Matching Engine Delays
Summary
The discussion models exchange round-trip latency as the sum of network transit time and matching-engine message-processing time. For venues in separate data centers, network distance and routing usually dominate: fiber routes are indirect, switches and routers add delay, and signals travel through fiber below the speed of light. The answer illustrates estimation with distances among U.S. equity exchange locations and gives an example range for a cross-venue round trip, while emphasizing that actual figures depend on the route and are rarely disclosed.
Participants can influence network transit by choosing more direct fiber routes, whereas matching-engine processing is largely determined by exchange infrastructure and load. Within one data center, cross-connect paths are more standardized, making a participant’s own software and internal processing more significant. A separate answer suggests that non-HFT users can measure practical order-to-quote timing by observing an order appear in market depth under quiet conditions. These are estimates and measurement ideas, not universal guarantees: venue, connection, route, load, and measurement boundaries all affect observed latency.
Key ideas
- Round-trip latency includes both network transit and exchange message processing.
- Cross-data-center transit often dominates because physical routes and network equipment add delay.
- Fiber routing choices can reduce transit time, while exchange processing is mostly outside a participant’s control.
- Within a data center, internal software latency can matter more than the standardized connection path.
- Observed latency varies by venue, route, load, and measurement method.
Tags
Full text
# Latency and Delays across Exchanges
# Latency and Delays across Exchanges
I have recently come across this paper by Battalio et al. "Can Brokers Have it all? On the Relation between Make Take Fees & Limit Order Execution Quality" and realized how little I know about the "plumbing" connecting the exchanges (I'm taking about US equities.)
After reading this paper I have been thinking about what kind of delay/latency is there when trading simultaneously on several exchanges. Assuming that I have already decided the Limit Order sizes and the target venues I want to send them to, and assuming that I send the Limit Orders to the various exchanges at the same time, what kind of delay can I expect in the time-stamp of the "Limit Order Submission" message reported in the data-feed of the various exchanges? I assume that it depends from what kind of connection I have to the exchange, from the time of day, from the type of stock and so forth but I'm still curious about a range of possible values.
## Answer by Louis Marascio (score 7, accepted)
https://quant.stackexchange.com/a/18877
The round-trip latency from point A to a matching engine at point B can be thought of being comprised of two components:
$RTT_{total,A \rightarrow B} = RTT_{network\_transit,A \rightarrow B} + MPL_{matching\_engine,B}$
Where $RTT$ is the round-trip time and $MPL$ is the message processing latency (how long it takes to receive a message and produce an event). The total round trip time, $RTT_{total}$ would be measured from the moment it leaves your network interface (i.e., excluding whatever internal processing day your software may have) to the moment your network interface receives the message indicating the action has been processed. You might find my other answer regarding latency informative: HFT - How to define and measure latency?.
Now, with respect to $RTT_{total}$: when communicating with an exchange in an different data center transit latency will almost always dominate. Matching engines are very fast, but moving packets can be relatively slow in comparison. For example, from Carteret (where NASDAQ hosts their matching engines) to Mahwah (where NYSE hosts theirs) is approximately 45 miles (rough measurement from Google Maps). The best case round-trip transit latency is about 500$us$ (approximately 250$us$ one way), but this is not achievable due to frictions related to network transit: (1) fiber doesn't run as the crow flies; (2) switches and routers add latency along the way; and, (3) packets don't travel at the speed of light through fiber (I believe it is about 70% of $c$).
Now, Mahwah and Carteret are the two extreme cases as they are the two data centers furtherest away from each other. The BATS data center is located in Weehawken at NY5. This data center is about at the half-way point between Mahwah and Carteret so you would be looking at a best-case (unachievable) round-trip latency of about 250$us$.
Transit latency is also the only component directly under the control of the participant. $MPL_{matching\_engine}$ is largely a constant for all participants (although, not always due to matching engine architecture and loading of order entry gateways). $RTT_{network\_transit}$, on the other hand, can be manipulated by reducing 2 of the 3 frictions above. The revelation made in "Flash Boys" was well known throughout The Street (it seems Brad and the IEX guys were somewhat late to the party): there was a lot of low-hanging fruit in minimizing the impact of the first friction: the path that the fiber takes. By doing this savvy participants can be closer on a relative-basis to other matching engines even if they are located directly next to their competitors in real-space.
Remember, this discussion is almost exclusively limited to cross-data center messaging. There is very little ability to minimize the impact of $RTT_{network\_transit}$ within a single data center because: (1) the length of fiber interconnects are largely normalized for all cross-connected participants; and, (2) there are very few network elements between participant and matching engine. This means that internal latency to a specific participant is the most important (in other words, faster software).
All that being said, to answer your question specifically is not something many folks will do as latency numbers are held close to the vest. However, the reason for all of the above is to demonstrate to you that you can easily estimate it by simply estimating $RTT_{network\_transit}$. I think you'll find that, for example, $RTT_{total,NASDAQ \rightarrow ARCA}$ is going to be between 600$us$ and 1.5$ms$ assuming that packets travel through fiber at $0.7c$ and then depending on what penalty you want to add for the path of the fiber.
## Answer by dkhokhlov (score 0)
https://quant.stackexchange.com/a/18862
Assuming you are not doing HFT, seconds scale, then you could measure it. By placing a limit order and then monitoring its appearance in Level 2 market depth quotes. During quiet market, with limit price away from spread and not crowded.
## Answer by Helin (score 0)
https://quant.stackexchange.com/a/18863
I'm no expert in this topic, but I'm not sure people will be willing to share this kind of data openly, given a lot of HFT shops use such "trade secrets" to gain a competitive edge. Incidentally, I've been reading the book "Flash Boys" and there are some numbers related to your query in there. For instance, when you submit a trade from downtown Manhattan, it reaches BATS first, before going elsewhere...Shown in full with attribution under the source's licence. Licence: CC BY-SA 4.0 (Stack Exchange)
This summary was written by Stratmill's research agent from the original; it is not a copy of the source.