Treasury futures DV01 can jump when the cheapest-to-deliver (CTD) bond changes, making the current CTD’s sensitivity an incomplete measure of contract risk. The document describes option-adjusted DV01 (OA DV01), which accounts for the delivery choice and changes smoothly as yields move. It outlines a simple simulation: generate delivery-date yield scenarios, calculate each eligible bond’s converted forward price, identify the CTD in each scenario, and estimate the futures price across scenarios. Perturbing yields and measuring the change in the resulting price gives an OA DV01 estimate.
The approach can also estimate delivery probabilities. Its illustrative version assumes two deliverable bonds, normally distributed yield changes, and parallel curve shifts. Suggested refinements include convexity adjustment, historical yield betas, and a multifactor model. Timing, end-of-month, and wild-card options are omitted, and the document notes that some can materially affect results. It also mentions that some bank reports and a Bloomberg function provide related CTD and sensitivity information, though the example model is deliberately simplified.
Key ideas
- CTD changes can cause discontinuities in the DV01 calculated from the currently cheapest bond.
- Option-adjusted DV01 reflects delivery choice and varies smoothly as yields shift.
- A scenario model can identify the CTD in each yield scenario and estimate futures prices.
- Perturbing yields around the modeled price provides an OA DV01 estimate.
- Single-factor grids omit some delivery options and relative yield movements that can matter.
Tags
Full text
# Calculating DV01 for Treasury Futures with CTD switch risk # Calculating DV01 for Treasury Futures with CTD switch risk With rates rising, certain contracts, such as the USZ3, are prone to frequent CTD switches with sometimes large differences in the DV01 of an underlying CTD. Does anyone know of any resources for calculating the DVO1 for a treasury future that is prone to CTD change risk or alternatively any off the shelf solutions that can handle this? Bloomberg seems to have nothing. Thanks! ## Answer by Helin (score 9, accepted) https://quant.stackexchange.com/a/76864 You are trying to calculate the so-called "option-adjusted DV01" (OA DV01). The nice thing about OA DV01 is that it's a smooth function of yield shifts. I'm going to be lazy here and simply post a figure from an ancient report titled "The Salomon Brothers Delivery Option Model" (Mark Koenigsberg, 1991): As you can see, when yield level changes, the CTD's DV01 can of course jump around, but the model-based OA DV01 transitions smoothly. If you don't want to calculate these numbers yourself, you can get them very easily from a lot of sell-side banks. At JP Morgan, for example, you’d search for “U.S. Treasury Future Basis Reference Sheet” and the numbers you are looking for are printed under “OA BPV.” At Barclays, you’d search for “CBOT Futures Multi-factor Analysis Report” and the numbers are printed next to “$ PV01.” Morgan Stanley also has "US Bond Futures Daily Report" and the label is simply "DV01." As a shameless plug, my current company also provides these numbers on the Augur Labs Infinity platform. If you want to create a simple model to calculate this yourself, it’s actually not that difficult. Here's a highly stylized example: - Imagine there are only two bonds that can be delivered into the contract. - One of the bonds is the current CTD. Start by creating 1000 yield scenarios as of the delivery date for it (more scenarios would be better, but 1000 is a good starting point). For simplicity, you can assume that yield changes are normally distributed; the yield on the delivery date may have a mean corresponding to the current forward yield and a volatility inferred from bond futures options. Based on these yields, you can easily calculate the converted forward price for the current CTD at each yield level. - For the other bond, let’s assume that the yield curve can only move in a parallel fashion, so now you have 1000 forwards yields for the other bond too, and you can again compute the converted forward prices. - For each yield level, you’d compare the two bonds and see whose converted forward price is lower. That tells you who the CTD is for each yield level and you also know what the theoretical futures price should be at that yield level (simply the minimum converted forward price). - Now it should be straightforward to summarize the delivery probability of each bond from step 4, as well as the futures model price (the probability-weighted futures price). - To compute the OA DV01, you can simply perturb the initial yields by say 10 bps and see how much the probability-weighted futures price changes. Alternatively, you can calculate the probability-weighted DV01 (the former is preferred when we introduce more features into the model). The simple model above ignores a lot of subtleties, which is only casually reviewed here: - In Step 2, you can either use the CTD as the reference bond or an on-the-run bond as reference. I personally prefer the latter approach. - In Step 2, you should also include a convexity adjustment to ensure that the probability-weighted forward price for each bond matches the current forward price, so that there's no arbitrage opportunity. - In Step 3, instead of assuming parallel shifts of the yield curve, you can shift the other bonds using their historical yield betas to the reference bond. - The model also ignores the a) timing option, b) the end of month option, and c) the wild card options. a) is not super valuable, but b) and c) can be meaningful. These are difficult to handle and I'd recommend consulting specialized readings. Instead of this kind of simplistic grids, a term structure model might be more suitable. - This model is a single-factor model. The advantage is simplicity – you can literally create this model in Excel with a 2-dimensional grid (deliverables on one axis and yield levels on the other). Ideally, you’d use at least a two-factor model to more accurately capture relative yield movements. For a real-world example that implements this kind of two-factor model using a grid, search for "The Lehman Brothers Multifactor Futures Model" (Phil Weissman & Ralph Axel, 1997). ## Answer by dm63 (score 2) https://quant.stackexchange.com/a/76844 Bloomberg has everything ! USZ3 Comdty DLV gives the delivery basket. If you type CMS (go) it then shows how the ctd switches and the ensuing change in dv01 of the futures contract. Today it shows that a 40bp sell off causes the ctd to switch from 2040 bonds to 2042 bonds, with a dv01 change from 12.6 to 14.0.
Shown in full with attribution under the source's licence. Licence: CC BY-SA 4.0 (Stack Exchange)
This summary was written by Stratmill's research agent from the original; it is not a copy of the source.