Summary

The document explains why a Monte Carlo estimate for an up-and-out call can be too high when simulated paths use discrete time steps. A path may cross the barrier between sampled points and return below it before the next observation, so checking only the simulated prices can miss a knockout. Using finer time steps reduces this missed-crossing error, though it increases computation.

The answers also point to Brownian bridge techniques, which estimate the probability of a barrier crossing between observations and can improve accuracy without requiring extremely fine time steps. The question’s reported estimates move toward a pricing benchmark as the simulation grid is refined, illustrating the discretization issue. The discussion does not provide a full derivation, benchmark assumptions, or a quantitative comparison of methods; barrier monitoring conventions and model assumptions also affect the appropriate price.

Key ideas

  • Discrete path sampling can miss barrier crossings that occur between simulated time points.
  • Finer time steps generally improve the representation of barrier events but increase computational cost.
  • Brownian bridge methods can account for possible crossings between simulated observations.
  • A Monte Carlo confidence interval does not remove bias caused by discretizing the path.

Tags

Full text
# Error in barrier option pricing Monte Carlo


# Error in barrier option pricing Monte Carlo












I am currently trying to price an up-and-out call with Monte Carlo simulation. For an option with these parameters :



- $K$ = 50

- $\sigma$ = 30%

- $R $ = 1%

- $T$ = 1Y

- $S_0$ = 50

With 10.000 simulations and $dt = \frac{1}{500}$ I obtain an option price close to 0.80 (95% interval confidence : [0.76 ; 0.853]) whereas a pricer gives 0.73. When rising number of simulations the price increases so I am likely doing something wrong.

Here is the python chunk of code that I use:

```
all_final_payoffs = np.zeros((nb_simulations,1),dtype=float)

for i in tqdm(range(nb_simulations)):
    path_generated_asset = np.zeros((1, nb_time), dtype=float)
    path_generated_asset[0, 0] = S0
    for j in range(1, nb_time):
        X = np.random.randn(1)
        path_generated_asset[0, j] = simulate_price(path_generated_asset[0, j - 1], interest_rate, volatility, dt, X)
    all_final_payoffs[i,0] = compute_barrier_call_payoff(path_generated_asset[0,:],strike,barrier)
option_price = np.mean(all_final_payoffs)*math.exp(-interest_rate*maturity)
```

And the two functions used :

```
def compute_barrier_call_payoff(asset_path,strike,barrier):
    if max(asset_path)>=barrier:
        return 0
    else:
        if asset_path[-1]-strike>0:
            return asset_path[-1]-strike
        return 0

def simulate_price(S,R,Vol,dt,X):
    return S*math.exp((R-(Vol**2)/2)*dt + Vol*math.sqrt(dt)*X)
```

Does someone know where my error is? Thanks a lot!

Edit: When increasing the number of simulations to 20.000 and time steps to 2000, I get the price in 3 minutes (very long) on Python. Same code in C# on the same Mac, the program gives me the result in 7 seconds. When increasing simulations to 50.000 and time steps to 4.000 it takes roughly 35 seconds to give me 0.74$.

Edit 2 : Launching the Python code with Cython and typed variables it takes 1 minute.

## Answer by Ramanujam Narayanan (score 2, accepted)

https://quant.stackexchange.com/a/37188

The path dependency of barrier options requires a sufficient number of steps to accurately model price evolution. For example, the stock price simulation,

for dt=1/10,

for dt=1/500,

for dt=1/1000,

It can be seen that, if you use fewer number of steps, a barrier might not be triggered which would otherwise have been triggered if more number of steps were used. That is, increasing number of steps better models the underlying's price movement, thus increasing accuracy of the simulation. This becomes very important while pricing path dependent derivatives.

## Answer by Yian Pap (score 2)

https://quant.stackexchange.com/a/37254

You can also read through the answer to this related question: How are Brownian Bridges used in derivatives pricing in practice?

Please also note that the timings mentioned are terribly slow. I know speed is not Python's strong point, but still. 3m50s for 20000 simulations with 2000 time steps (dt=1/2000) gives one the wrong idea of how efficient MC can be or not. Downloading this pricer you can see that this shouldn't really take more than half a second (on a budget laptop). Using this app you can also play around with the the Brownian Bridge technique and see how if you use it you then don't need such low dt's to get accurate Monte Carlo barrier prices.